The audit trail for Gulf state capital: every announced megawatt, megatonne and megadeal tracked from press release to steel in the ground.3 September 2026
The Energisation Ledger · row SA-ar-rass-1-solar

Ar Rass 1 Solar PV

First recorded 3 September 2026Verified as at 3 September 2026 at 11:28 UTC1 revisions
Project
Ar Rass 1 Solar PV
Country
Saudi Arabia
Type
IPP solar
Developer
ACWA Power, SPIC (Huanghe Hydropower Development), Badeel
Announced capacity, MW
700
Operational capacity, MW
700
Announced
2022-03-08
Current recorded status
operational
Status as at
2024-08-15

This row records dated data only. No derived field is computed for entries in the United Arab Emirates or Saudi Arabia.

Revision history

3 September 2026 at 11:28 UTC · row created
typestatuscountryprojectdeveloperstatus_dateannounced_dateannounced_capacity_mwoperational_capacity_mw