The audit trail for Gulf state capital: every announced megawatt, megatonne and megadeal tracked from press release to steel in the ground.3 September 2026
The Energisation Ledger · row SA-ar-rass-2-solar

Ar Rass 2 Solar PV

First recorded 3 September 2026Verified as at 3 September 2026 at 11:28 UTC1 revisions
Project
Ar Rass 2 Solar PV
Country
Saudi Arabia
Location
Ar Rass, Qassim Province
Type
IPP solar
Developer
ACWA Power and Badeel
Announced capacity, MW
2,000
Operational capacity, MW
1,000
Announced
2023-05-22
Current recorded status
partially operational
Status as at
2025-08-21

This row records dated data only. No derived field is computed for entries in the United Arab Emirates or Saudi Arabia.

Revision history

3 September 2026 at 11:28 UTC · row created
typestatuscountryprojectlocationdeveloperstatus_dateannounced_dateannounced_capacity_mwoperational_capacity_mw